Pile testing: what static, dynamic and integrity tests each prove

Load tests show how much a pile can carry and how much it settles, and integrity tests show whether the shaft is sound. A testing plan normally combines them.

By the GEODEN technical team · Published

The question each test answers

TestWhat it showsMain limit
Static load testLoad-settlement behaviour under a sustained loadSlow and costly, so only a few piles are tested
Dynamic load testCapacity estimated from the response to a hammer blowInterpretation depends on analysis and correlation
Low-strain integrity testMajor defects and approximate length of the shaftLimited on long piles; cannot measure capacity
Cross-hole sonic loggingConcrete quality between tubes cast into the pileTubes must be planned before concreting

Static load tests

A static test loads the pile in steps with a hydraulic jack against a reaction system, such as kentledge or anchor piles, while settlement is measured. It is the most direct evidence of pile behaviour.

Preliminary test piles are loaded to high loads before the working piles are built, to confirm the design. Working piles are proof tested to a lower multiple of their working load.

Dynamic load tests

A dynamic test strikes the pile head with a heavy hammer while sensors record force and velocity. Signal-matching analysis estimates the capacity and how it is shared between shaft and base.

Dynamic tests are quick, so more piles can be covered. They are commonly correlated with static tests on the same site.

Integrity tests

A low-strain test taps the pile head with a hand-held hammer and reads the reflected wave. It is quick and cheap, and it is often carried out on all or most piles.

Cross-hole sonic logging sends a signal between tubes cast into the pile and profiles the concrete between them over the depth of the tubes. It suits large-diameter bored piles.

Building a testing plan

  • Agree the number and type of tests with the consultant before piling starts.
  • Decide early which piles need tubes for sonic logging.
  • Choose which piles are tested with the consultant, including piles with unusual installation records.
  • Allow the concrete to gain strength before testing.
  • Agree what happens if a pile fails a test: further testing, redesign or replacement.

Related services